![]() Qualifications of maintenance & repair employees. Operator training, certification, and evaluation. ![]() ![]() Signals - voice signals - additional requirements. Signals - radio, telephone or other electronic transmission of signals. Wire rope - selection and installation criteria. Power line safety - while traveling under or near power lines with no load. Power line safety (all voltages) - equipment operations closer than the Table A zone. Power line safety (up to 350 kV) - equipment operations. Power line safety (up to 350 kV) - assembly and disassembly. ![]() If the actual information at the lifting site does not tally with the lifting plan, you should stop the operation until the plan has been updated and re-approved.Assembly/Disassembly - selection of manufacturer or employer procedures.Īssembly/Disassembly - general requirements (applies to all assembly and disassembly operations).ĭisassembly - additional requirements for dismantling of booms and jibs (applies to both the use of manufacturer procedures and employer procedures).Īssembly/Disassembly - employer procedures - general requirements.You should never deviate or vary from the approved lifting plan.Sketch of the lifting zone (showing position of lifting equipment, crew and load) and.Requirements to erect or dismantle lifting equipment (if any).Lifting crew (including their roles and competencies).Your lifting plan should include, but not limited to, the following elements: load capacity chart, range diagram, rigging method)įor complex lifts, additional engineering design efforts are necessary to ensure that the lifting operation is conducted safely. Safe work procedure or method statement. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |